Lift Safety RADIX Mount for HHS23C & HHS23S Curved Full Face Shields

SKU# HRXS-23M
5 out of 5 Customer Rating
See Price in Cart
Discounted Price Shown in Cart
Discounted Price Shown in Cart
Sale:
Was:
Out of Stock
Delivery to -
- Est. Arrival - Est. Ship - Est. Arrival - Get it as soon as {0} Edit location
Add Zip Code
Pick Up at
Store Address -
Available within 4 hours
Contact Store:
Est. Email Delivery: within 24 hours
Made In USA
 
Lift Safety RADIX Mount for HHS23C & HHS23S Curved Full Face Shields
See Price in Cart
Discounted Price Shown in Cart
Discounted Price Shown in Cart
Sale:
Was:
Out of Stock
+ 12% OFF w/ code at checkout
Selected Delivery Method: Shipping
Shipping
Get it as soon as {0}
Pick up in Store
Available within 4 hours
Not Available for Pick Up
Qty
Secure Checkout
Affirm
Pay over time
with Affirm on orders over $150

Product Details

Lift Safety RADIX Mount for HHS23C & HHS23S Curved Full Face Shields

Description

Lift Safety RADIX Mount for HHS23C & HHS23S Curved Full Face Shields

This faceshield mount integrates seamlessly with the Radix helmet. It snaps easily into designated helmet slots for quick installation. Is compatible with Noise Control earmuffs, safety glasses and headlamps. Adapter tilts to provide a personalized fit and optimal visibilty.

View Warning Label

Features

Mount for the Radix hardhat
Fits the HHS23C & HHS23S faceshields
Fits the Radix hardhat
Lift Safety mount for Radix

Specifications

Brand Name
Lift Safety
Assembled Weight (lbs)
1
California Proposition 65 Warning Required
Yes
Country of Origin
China

MFG Part # (OEM)
HRXS-23M

Package Contents
Faceshield Bracket

Product Condition
New

Restrictions
CA Prop 65

UPC
879501004844

Warranty Type
1 Year Limited

Customer Reviews

From The Manufacturer